QA / QC Guidance
Why Surface Preparation and QA/QC Often Determine the Outcome of a Manhole Lining Project
Independent editorial
Bonded manhole linings depend on the host surface and on the tests that confirm the work. This article explains how substrate condition, application controls, testing, and acceptance criteria influence rehabilitation performance.